Why You Should Forget About Improving Your Golden Rule 2 - Energized System

Implementation of procedures, controls 
and specialized personnel guarantee 
safety during activities where energized 
systems are present.




PLAN

• Verify that a specific energy isolation procedure is in place. 
• Each job shall be both risk assessed and performed 
by competent personnel.
• Ensure that the permit to work refers unambiguously 
to the equipment on which the intervention is requested.
• Guarantee to periodically inspect and maintain portable 
appliances and equipment, which work under energy.



READY?

• Is an energy isolation certificate completed in conjunction 
with and referred to in the PTW?
• Have you verified that no stored energy or other hazards 
remain prior to start your job, and that the energy isolation 
is properly done?
• Does authorized competent personnel, who has been 
appointed by the Company Management, perform 
the energy isolation?
• Are the PPEs identified by the Employer in the specific risk 
assessment for the required task, in good condition and worn 
by all people? 



GO!

• Do not carry out unauthorized activities. Follow the provisions 
of the permit to work.
• Use lockout and tagout devices to inform of isolation and to 
prevent non-authorized operations.
• Ensure that no work or equipment movement is allowed 
under or near an overhead power line unless precautions 
have been taken.